Clipsal C-Bus design, installation, programming and support

01922870500  ·  info@uniqe-bulidings.co.uk

Commercial

Buildings that run
on less attention.

Lighting, heating, cooling and occupancy managed from one system, with the reporting to show what it is saving. Suitable for offices, hotels, restaurants, retail, schools and larger buildings.

Sectors

Where C-Bus earns
its place.

01

Offices

Zoned lighting, occupancy control and meeting-room scenes across open plan and cellular space.

02

Hotels

Guest-room control, corridor scheduling and public-area scenes that match the time of day.

03

Restaurants

Service, dining and close-down lighting levels set precisely and recalled by staff in one press.

04

Retail

Display lighting, trading hours and out-of-hours security lighting handled automatically.

05

Schools

Classroom presets, corridor occupancy and holiday schedules that cut wasted energy.

06

Larger buildings

Multi-floor control, plant integration and building-wide overrides from a single interface.

What it manages

One platform for the
day-to-day of a building.

Facilities teams get predictable behaviour, clear overrides and a system that can be changed without rewiring.

01

Lighting

Zones, dimming levels, scenes and after-hours behaviour across every floor.

02

Heating and cooling

Set points and schedules per zone, tied to occupancy rather than a single timeclock.

03

Occupancy

Sensors switch and dim automatically in circulation space, WCs and rarely used rooms.

04

Energy usage

Monitoring and reporting on the loads that matter, with data to support real decisions.

05

Meeting rooms

Presentation, meeting and cleaning presets, with AV and blinds included in the scene.

06

Building-wide control

Central overrides, holiday calendars and clear reporting of what is running.

cs-2

How we deliver

Planned around
an occupied building.

Most commercial work happens around trading hours, tenants and staff. We plan phasing, isolation and testing so disruption stays predictable.

01

Site survey and audit

What is installed, what is failing and what the building actually needs.

02

Specification

Equipment schedule, zoning plan and control philosophy documented for sign-off.

03

Phased installation

Out-of-hours works, floor-by-floor handover and clear method statements.

04

Handover and training

Documentation, backups and a short session so the facilities team stays in control.

“The building used to be lit at full output whether anyone was in or not. Now the lighting follows occupancy and we have the reporting to prove the difference.”

Facilities manager, commercial office project

Commercial enquiries

Request a commercial
consultation.

Send us the building type, approximate floor area and what you want to improve. We will come back with an approach, a rough scope and the next practical step.